Home |  Schedule of Charges |  Forms |  Contact Us |  Site Map
  2012 Capital Projects      
Conservation Tips from SWD16

Annually, Silverdale Water District focuses on system improvements based on need and coordination with other utilities.

CHAGNON PLACE WATER MAIN

Plans

Specifications and Documents
Addendum 1

Addendum 2

Addendum 3

SWD
• Pressure Reducing Station - Westridge

• Pump Station (Well/Booster) - Newberry (KPUD)

• Water Main Extension - Chagnon Place
• Water Main Extension - Clear Creek Road

• Water Main Extension - Eldorado Boulevard
• Water Main Extension - Mountain View Road Overpass

• Water Main Extension - Paulson Road

• Water Main Extension - Schold Place

• Water Main Extension - Silverdale Way

• Water Main Extension - Silverdale Way Roundabout

• Reclaimed Water Main Extension - Paulson Road 2011

• Reclaimed Water Main Extension - Silverdale Way Roundabout

• Reclaimed Water Main Extension - South Central

PWTF

• Pump Station - Chena

• Reservoir - Chena
• Reservoir - Mixing Valves

• Water Main Replacement
• Water Quality - Chlorination

• Water Quality - Manganese Treatment - Ridgetop

DWSRF

• Meter Installations - Apex

• Pump Station - Apex
• Reservoir - Apex

• Water Main Extension - Apex

  • Efficient water use can save you money on water & utility bills.
  • Clean vegetables in a pan of water and not under a running faucet. Water used to clean vegetables can also be used to water houseplants.
  • Check faucets and pipes for leaks. A small drip can waste 20 or more gallons of water per day.
  • Each flush wastes water. Don't use the toilet as a wastebasket.
  • Keep a bottle or pitcher of drinking water in the refrigerator. This eliminates letting the tap run while waiting for the water to get cold.

© 2009 Silverdale Water District